geotechnical-studies

  • Geotechnical study for the precipitation that happened in Tymfristos' tunnel "Χ.Θ. 1+527.20", Eastern Front Lamia.
  • Geotechnical study for the precipitation that happened in Tymfristos' tunnel "Χ.Θ. 1+565.20", Eastern Front Lamia.
  • Geotechnical και Geological study for the slope stability of the road Rahes Tymfristos - Profitis Helias from "Χ.Θ. 0+000.00 έως την Χ.Θ. 4+500.00".
  • Geotechnical και Geological study for the terrain movements in Western Front Anilio, tunnel in Metsovo.
  • Rock mass classification at Bieniawski and at Lauffer-Pacher for the study Construction of road tunnel in Tymfristos.
  • Geotechnical study of adaptability of retaining bracing measures of in the Construction of Road Tunnels in Pindos Flysche
  • Geotechnical study on the work necessary to water runoff from the roof and walls of the tunnel Tymfristou.
  • Geotechnical study for the need to use special Concrete little weight for Filling Geological forfeitures occurring during the Construction of Road Tunnels.
  • Geotechnical study for the geological forfeiture that happened in road tunnels in Tymfristos.
  • Geotechnical study on the Control of forfeiture in Intensely weathered geological formations encountered during construction of the tunnel in the Ridges Tymfristoy.
  • Geotechnical study on Adaptation Measures in Cases of Temporary Retaining Change Characteristics of the geomechanical rock mass during excavation for the construction of a road tunnel.
  • Geotechnical Construction Charter Road Tunnel Tymfristoy "Χ.Θ. 0+839.997 - Χ.Θ. 1+399.902".
  • Geotechnical Construction Charter Road Tunnel Tymfristoy "from Χ.Θ. 0+797.724 to Χ.Θ. 0+960.500 and from Χ.Θ. 1+153.370 to Χ.Θ. 1+353.390".
  • Papermaking equal convergences for Sections of the tunnel Tymfristoy from Χ.Θ. 0+797.724 to Χ.Θ. 0+960.500 and from Χ.Θ. 1+153.370 to Χ.Θ. 1+353.390.
  • Authorship Masonic Diagrams for Tunnel Tymfristoy (Χ.Θ. 0+839.997 to Χ.Θ. 1+399.902).
  • Study of Potential slip on the tunnel ceiling Tymfristoy from Χ.Θ. 0+839.997 to Χ.Θ. 1+399.902.
  • Geotechnical Support-Consulting on the Construction of Road Tunnel Krystallopigi, Egnatia Odos.
  • Sort rock mass at Barton Tunnel Tymfristoy from Χ.Θ. 0+962.390 to Χ.Θ. 1+164.450.
  • Sort by Bieniawski and lauffer-Pacher of rock mass in Tunnel Tymfristoy from Χ.Θ. 0+839.997 to Χ.Θ. 1+399.902.
  • Recording of Point Water and Drafting corresponding maps in Tunnel Tymfristoy from Χ.Θ. 0+839.997 to Χ.Θ. 1+399.902.
  • Stereographic Schmidt network diagrams for the study of Road tunnel in Tymfristos.
  • Geologicalς-Geotechnical report of adequacy in the area of Monolithi, Mytikas.
  • Technical-geological report for exploration drilling on the municipality GALAXIDI.
  • Study for improving carrying capacity of the bridge Belley - Bania.
  • eotechnical studies in the tunnel ΣΒ (right and left branch), in a section of Bypass Patras.
  • Geotechnical research-study for IKA in Kato Achaea.
  • Geotechnical studies in the tunnel ΣΑ (right and left branch), in a section of Bypass Patras.
  • Geotechnical studies in the tunnel ΣΓ (right and left branch), in a section of Bypass Patras.
  • Geotechnical reaearch and soilmechanics study for Slope Stability Investigation in Mounta,Cephalonia.
  • Technogeological study and Soilmechanics research slump from Χ.Θ. 2+966,93 to Χ.Θ.3+620,43 (bypass Nafpaktos).
  • Geotechnical works from Χ.Θ. 24+909,50 to Χ.Θ. 25+375,20 withing Tunnel Construction St. Elias in the part of Paraionias Road from the end of bypass "Charms" to "Gaidouropnichti.'"
  • Geotechnical reaearch in tunnel ΣΓ (right branch) of Patras Bypass Road.
  • Geotechnical reaearch in the site of construction municipality building, Leontio Achaea.
  • Geotechnical study Χ.ΥΤ.Α. Αιγείρας.
  • Geotechnical study of constructing Gym in Kalithea, Rhodes.
  • Geotechnical study for the completion of drainage in Agia Evfimia.
  • Rebuilding bridges in Messolonghi - Aetoliko lagoon.