hydraulic-drawing

  • Rational Management of Aquatic Resources with Parallel Implementation of Water Supply Phase B Municipal Elatovrysis APODOTIAS.
  • Feasibility Study-Sustainability Project of Creation kayak rack in Erymanthos River.
  • Water Supply Study KALAVRYTA.
  • Water Supply Study, AROANIA.
  • Design study of three entrances in the city of Messolonghi.
  • Design of waste landfill in Aegera, Achaea.
  • Rehabilitation study of waste landfill in Aegera - Akrata, Diakofto, Achaea.
  • Study of road construction in Raptei, Styra (supporting studies).
  • Rehabilitation of waste landfill in Valmorahe (final design and tender documents).
  • Promotion study of gorge in Klesoura.
  • Final Design - Construction Works for Protection of Coastal Highway in Heroes Polytechnic - Patras.
  • Additional Hydraulic Study Project: Shaping the 4th District Road Department Kanalaki - castle.
  • Delineation Study of streams within the Municipal of Loutsa (beach).
  • Final study on rehabilitation of waste landfill in Andritsena.
  • Final study on rehabilitation of waste landfill in «Forest Thinon», Vartholomio
  • Final study on rehabilitation of waste landfill in Ag Theodori, Korivos.
  • Arrangement of the Existing Waste Landfill and cell expansion to 'Nevropoli' municipality Lamia. Preliminary and Tender.
  • Final study on rehabilitation in waste landfill formar municipality of Alefera.
  • Technical study on rehabilitation of waste landfill in municipality of Aegialia, Boufou Lagada
  • Environmental study for Permitting a Waste Transfer Station in the City AIGIALEIAS.